PG Saathi
← Back to overview
🛡️

Compliance tracking & reminders

Every compliance document's expiry date in one place, with reminders before each one runs out.

What it does

AMC Ahmedabad served notices to 385 PGs in September 2025 and sealed about 99 in February 2026 for missing No-Objection Certificates; from 9 September 2026 it runs city-wide structural-safety checks. The four NOCs are Society, Fire, Police and BU (Building Usage). Each expires on its own schedule.

PG Saathi tracks six documents: the four NOCs, AMC Estate approval and the structural-safety certificate (needed once the building is 15 years old, CGDCR Schedule 17) — seven if you serve meals, with FSSAI registration. Upload a PDF or photo once, set the expiry date, and the bot reminds you 60, 30, 15 and 7 days before it runs out. PG Saathi does not apply for or renew anything on your behalf.

A daily check also flags a stay that ended before 90 days. The GST exemption for this kind of accommodation (Notification No. 04/2024-Central Tax (Rate), entry 12A) covers up to ₹20,000 per person per month for a continuous stay of at least 90 days, so GST may apply to a shorter stay. Rent above ₹20,000 per person per month and contracts shorter than 90 days cannot be entered at all. Whether the exemption applies to you is for you and your tax adviser to decide.

On WhatsApp

  • `compliance` — status of every tracked document.
  • `upload noc` → bot replies with a secure upload link.
  • Daily cron: alerts you when something is approaching expiry.

On the dashboard

/compliance/upload — upload PDFs and set expiry dates. Status shown with traffic-light colours.

Why it matters

AMC inspections are unannounced. A lapsed NOC can be the difference between a routine visit and a sealed building. A reminder 60 days out gives you time to renew without rushing.

Example output (sample data)

Bot reply to `compliance` — Shree Krishna PG

Sample data · meals not served, building 18 years old

PG
PG Saathi✓
online
Compliance status ✓ Society NOC — valid until 2027-02-14 ⚠ Fire NOC — expires in 27d (2026-06-04) ✓ Police verification — valid until 2027-01-10 ✓ BU Permission — valid until 2035-08-15 ✗ AMC Estate approval — not uploaded ✗ Structural stability certificate — no certificate — building 18 yrs, AMC requires one (CGDCR Sch.17) Upload / update documents: <link> (link valid 15 minutes)
10:42

The four AMC NOCs

Society NOC

Cooperative Housing Society / Resident Welfare Association

Issued by your building's society or RWA committee. Confirms the society has no objection to the unit being used as paying-guest accommodation. If the society refuses, `noc refused society <date>` records the AMC hearing date.

Fire NOC

Ahmedabad Fire & Emergency Services (Gujarat Fire Prevention & Life Safety Measures Act, 2013)

Issued after an inspection of the building's fire-safety installations (extinguishers, hose reels, signage, exit lighting). Upload the certificate and its expiry date; PG Saathi reminds you before it lapses.

Police verification

Ahmedabad City Police — local police station

Tenant verification with the local police is the owner's own filing. PG Saathi prints the tenant verification form and the police register for free; you hand them over. Upload the police document you hold to track its date.

BU Permission

Ahmedabad Municipal Corporation — Building Usage / Use Permission

Granted by AMC when construction matches the sanctioned plan. Without BU, the building cannot legally be occupied — including as a PG.

A shared sandbox PG with sample tenants, payments, expenses. Resets hourly.

What it does